2. Basics of financing biogas projects

3. Financing of biogas projects in the Netherlands

3.1. Support tools in the Netherlands

3.2. Financing tools in the Netherlands

4. References

5. Contacts

1. Introduction The implementation of biogas projects requires three preconditions: good and stable legislative framework conditions, easy and transparent permitting procedures, as well as access to financing. If one of these three preconditions is weak or not given, the biogas project risks failure. In Europe, these preconditions are very good in countries like Germany and Austria. In other countries there is still considerable effort needed to improve them.

The present report provides an outline for financing conditions and procedures in the

top 5 EU countries with developed biogas market for agricultural biogas plants:

Germany (about 5000 agricultural biogas plants), Austria (320 biogas plants), Denmark (about 22 co-operated and 60 farm scaled biogas plants), the Netherlands (about 90 agricultural biogas plants) and Italy (150 farm based biogas plants). The graph on the next page illustrates the energy production of biogas in Europe.

This report serves as overview of good practices for biogas financing in countries with developed biogas markets. More precisely, this report shall assist policy makers and financing bodies in the BiogasIN countries: Bulgaria, Croatia, Czech Republic, Greece, Latvia, Romania and Slovenia to develop good framework conditions for biogas financing.

The BiogasIN project is supported by the “Intelligent Energy for Europe Programme” by the European Commission and aims to create a sustainable biogas market in Central and Eastern Europe (CEE): Bulgaria, Croatia, Czech Republic, Greece, Latvia,

Romania and Slovenia. Core of BiogasIN is the removal of framework barriers in CEE:

high administrative barriers both in permitting and financing phases.

Figure 1: Primary energy production of biogas in Europe in 2007 [EurObserv‘ER] Legend: Landfill gas Sewage sludge gas Other biogas (decentralised agricultural plant etc.)

2. Basics of financing biogas projects The initial investment for a biogas plant is generally very high and it usually requires the application of sound financing tools. The following list includes the investments

and costs for a typical agriculture biogas plant:

Costs for planning: engineering costs, costs for permits, taxes, certificates, etc.

• Costs for equipment (investment costs): technical equipment, buildings, • storage facilities, infrastructure, grid connection, etc.

–  –  –

Depending on the size of the biogas projects and the feedstock type, typical investors in biogas plants are single farmers, several farmers jointly investing in one biogas plant, and industry. In some cases also other investors are involved, such as e.g.

municipalities or waste companies.

Financing bodies will finance biogas projects depending on the expected financial performance compared to the project risks and depending on the credit worthiness of the investor. In general, profitability of investment in biogas project strongly depends on availability of the national supporting scheme (either as feed-in tariff or green certificates) and assurance that the project in question will be eligible to benefit from the support system at the operational phase.

Due to the high capital costs, usually debt capital is required for the implementation of biogas projects. Furthermore, equity capital of 20-30% of the total capital cost is usually required. In some countries, it is possible to receive a certain amount of project funding from public sources or to obtain low-interest credits. Public sources should be considered and included in the calculation/financial planning process.

Subsidies for biogas plants can be received for various fields of interest: agriculture, regional development, renewable energy projects, environment, structural funds, etc.

Common financing methods are credits from private banks. As indicated in Figure 2 below, there are two main types of typical financing for biogas projects: traditional financing by loans and project financing.

Figure 2: Traditional loan financing and project financing concepts For traditional financing the credit history of the company or investor (e.g. farm) plays an important role. On the one hand, the liability of the company depends on the assets of the biogas plant and, on the other hand, of the company which is in many cases the farm. Decisions of the financing bodies depend upon the annual financial statements of the company. This is the typical financing tool for single farmers investing in biogas projects.

In the framework of the project financing, the biogas project itself is regarded as legal entity (Figure 2). This tool is often used for projects in which several shareholders are involved (e.g. several farmers). Main criteria of this future oriented concept are rates of return and success of the project. Decisions regarding loans are based on the assets and the cash-flow of the biogas project. The predictability of the





cash-flow is thereby the important parameter/criteria, depending on following factors:

–  –  –

Contracts of electricity and heat sale • Availability and price of feedstock material • Legislation and insurance • Qualification and knowledge of the operator • Due to the good and predictable framework conditions, this cash-flow based concept is widely applied, for instance, in Germany.

Another financing tool is investment funds. An investment fund involves money from several small investors. All of them are investing in one biogas project. Costs and benefits are shared between the investors upon the consortium or joint venture agreement. Farmers can form a cooperative where each farmer has a share in biogas revenues proportionally to the provided substrate and its biogas yield and methane content.

Another financing option would be the cooperation with energy contractors. A contractor is usually a company specialised in biogas production. The type of cooperation with these contractors is manifold.

Finally, a biogas plant or dedicated equipment can be leased. The leasing company and the biogas plant operator are concluding a leasing contract. This may include whole biogas plants or the cogeneration unit, only. Leasing of cogeneration units is widely applied.

All above financing options could be combined and form some kind of derivative tailored for targeted niche of investors.

3. Financing of biogas projects in the Netherlands The Dutch biogas market comprises today about 90 biogas plants running on feedstock from agriculture. Electricity and upgraded biogas from biogas plants are mainly promoted in the Netherlands through price regulation in terms of bonus payments. Biogas plants in the Netherlands receive incentives depending on the source of the produced biogas and the utilisation of the waste heat. Projects where the use of waste heat is involved in the concept, or the CO2 is used for greenhouses, are supported by the government with better incentives. Renewable energy projects become eligible for subsidies, if they use innovative new technology. Thus, subsidies are rarely granted for biogas projects. Furthermore electricity from biogas plants is exempted from fiscal regulation mechanisms, such as tax allowances for writing off investments in installation generating electricity from renewable sources.

Typical investors in biogas plants are single farmers, groups of farmers jointly investing in one biogas plant, municipalities, energy utilities, waste companies and the industry.

The biogas market in the Netherlands has developed due to the financial stimulus through the previous MEP-programme (Financial stimulation of renewable energy production in the Netherlands). Since 2008, the SDE-programme (Besluit stimulering duurzame Energie – Incentive for sustainable energy production) is in place which provides a bonus payment for electricity produced from biogas plants. The development of biogas plants decreased rapidly when the SDE programme came into force with its strongly limited budget for bonus payments.

Nowadays only 30% of the applicants for the bonus payment receive financial support from the SDE scheme.

The following sections aim to give an overview of the legal aspects concerning the available means of promotion for biogas projects as well as commonly available financing tools and their conditions in the Netherlands.

3.1. Support tools in the Netherlands As described above, the main support tool in the Netherlands is the SDEProgramme, promoting the development of renewable energy sources through price regulation in terms of a bonus payment. The bonus payment is granted to renewable energy plant operators and aims to compensate the difference between the market price for electricity from fossil resources and electricity from renewable sources. The bonus payments for electricity from biogas plants are valid for a maximum period of 12 years.

Subsidies are granted only to a limited annual amount of the allocated SDE-fund. If the accumulated amount of the subsidies exceeds the limited funds, no subsidies can be granted. Subsidies will be granted according to the date of submission of the application.

The payment scheme guarantees a fixed bonus paid to the operator from the commissioning of the biogas plant onwards. The subsidy is the difference between the base tariff and the correction price, which corresponds with the actual energy price the producer receives. The base amount is based on the average cost price of biogas or electricity from biogas, which is determined by the Minister of Economic Affairs. The correction price is determined by the Minister of Economic Affairs at the beginning of each year and finalised at the end of each year.

The feed-in base tariff for electricity from biogas in 2010 is for:

–  –  –

The feed-in tariff for electricity contains a correction price of 0.047 €/kWh. The correction price for upgraded biogas is 0.208 €/Nm³ independent of the origin of the renewable gas. This corresponds with the energy price the producer receives for his produced renewable energy on the energy market.

The state bears the funding costs. The fund for all kinds of renewable energies promoted by the SDE-Programme has increased from 1.459 m€ in 2008 to 1.958 m€ in 2010.

Besides price regulation through the SDE-Programme, biogas projects in the Netherlands are also supported by subsidies through the EOS-Programme (Besluit EOS: demo en transitie-experimenten - Order on the Allocation of Grants).

The EOS-Programme came into force in 2004. It provides subsidies for research, development and market research projects in the field of renewable energy sources with a maximum grant being 40% of the total investment.

All technologies used in the generation of electricity from renewable sources in the Netherlands are eligible for subsidies from the EOS-Programme. Furthermore subsidies are only granted to companies and not to private individuals. The subsidies for the EOS Programme are funded by the budget of the Netherlands Ministry of Economic Affairs.

3.2. Financing tools in the Netherlands In the Netherlands, the Rabobank supports the financing of about 75% of all installed biogas plants. Besides the financing through Rabobank, investors in biogas projects may receive assistance in financing their biogas projects from private consulting companies, credit institutes and private banks. The lifetime of a loan for a biogas project depends on the guaranteed subsidy period.

The success of Rabobank, or Green Finance, a Rabobank Group, in financing biogas plants is partly due to the Green funds scheme, a tax incentive scheme of the Dutch government which is only available for capital intensive investments such as large scale biogas plants. Green financing enables investors to finance green projects less expensively, by offering a lower interest rate (1-2% lower) for environmentally-friendly investments.

The Dutch Greentech Fund will invest in promising Dutch technology start-ups developing innovative technologies or processes that make the chain from raw material to end product more sustainable. Among other factors, the focus here is on bioenergy. The fund will invest a maximum of 2.5 million in a business in the form of a minority stake. The share of the financial support depends on the project and will be fixed with approval of financing.

Furthermore, it is a common financing method in the Netherlands to finance biogas plants with credits from private banks including both traditional and project financing without any special conditions for biogas projects.

4. References Federal Ministry for the Environment, Nature Legal sources on renewable energy, http://www.res-legal.eu, standing 14.07.2010 Conservation and Nuclear Safety Rabobank Group Green Finance, www.rabobank.com Senternovem The Green Funds Scheme - a success story in the making http://www.senternovem.nl/greenfundsscheme/index.asp 5. Contacts Fraunhofer-Institute for Wind Energy and Energy System Technology Division Bioenergy System Technology M.Sc. Henning Hahn Königstor 59 34119 Kassel Germany Phone: +49/(0)561/7294-261 Fax: +49/(0)561/7294-260 hhahn@iset.uni-kassel.de www.iwes.fraunhofer.de WIP - Renewable Energies Dipl. Ing. Dominik Rutz M.Sc.

Sylvensteinstr. 2 81369 München Germany Phone: +49/(0)89/72012739 Fax: +49/(0)89/72012791 Dominik.rutz@wip-munich.de www.wip-munich.de European Biogas Association Ing. Franz Kirchmayr Vice President Avenue de la Fauconnerie 73 B – 1170 Brussels Belgium Mobile +43/6643040761 kirchmeyr@european-biogas.eu



Similar works:

«Case: 10-70016 Document: 00512994392 Page: 1 Date Filed: 04/06/2015 IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT United States Court of Appeals Fifth Circuit FILED No. 10–70016 April 6, 2015 Lyle W. Cayce JOHN REYES MATAMOROS, Clerk Petitioner – Appellant, v. WILLIAM STEPHENS, Director, Texas Department of Criminal Justice, Correctional Institutions Division, Respondent – Appellee. Appeal from the United States District Court for the Southern District of Texas Before JOLLY,...»

«Mullion Parish Council Meeting held on Tuesday 16 March 2010 at 7.00pm at The Schoolroom, Methodist Chapel, Mullion Councillors Present A V Gilbert Mrs C Rule (Vice Chairman) R Curnow P Wilkins Mrs S Ireland R Willey J Lang (Chairman) C Williams One member of the public also attended the meeting.1. Public Session No issues were raised under this item.2. Police Report Apologies had been received from PC Cormack and PCSO Berry. Their report, as attached to these Minutes, had been sent to the...»

«Application Report SLYA014A May 2000 Latch-Up, ESD, and Other Phenomena Eilhard Haseloff Standard Linear & Logic ABSTRACT The engineer designing an electronic system often needs to know the behavior of its components under operating conditions that are outside those usually described in the data sheets. Thus, although the latch-up effect is no longer a problem with modern CMOS circuits, a closer look at this phenomenon makes it easier for the engineer to assess realistically the risks that may...»

«To appear in Robert Garcia, ed., Substance: New Essays (Philosophia Verlag) Quasi-Supplementation, Plenitudinous Coincidentalism, and Gunk Cody Gilmore Introduction Much in mereology is controversial. Is parthood governed by a uniqueness of composition principle? By principle of unrestricted composition? Reasonable people disagree. But there are areas of relative consensus. Nearly everyone on both sides of these controversies agrees that parthood (the being a proper-or-improper part of...»

«A CIESIN Thematic Guide to Social Science Applications of Remote Sensing Alex de Sherbinin 1 Deborah Balk Karina Yager Malanding Jaiteh Francesca Pozzi Chandra Giri Antroinette Wannebo October 2002 [Chapter 3 updated January 2006] Center for International Earth Science Information Network (CIESIN) Columbia University Palisades, NY, USA Sponsored by the Socioeconomic Data and Applications Center (SEDAC) of the U.S. National Aeronautics and Space Administration, Goddard Space Flight Center under...»

«Link 2 – Adelaide City Council Submission to the State Government ‘Food Trucks in SA’ Position Paper The State Government has released the ‘Food Trucks in SA’ Position Paper which proposes ways in which State Government could help Mobile Food Vending (MFV) operators gain greater consistency in operating conditions across multiple council jurisdictions in South Australia. The Adelaide City Council has reviewed the ‘Food Trucks in SA’ Position Paper and carefully considered the...»

«NURIOOTPA HIGH SCHOOL Tradition—Relationships—Excellence P 8562 2022 E dl.0788.admin@schools.sa.edu.au F 8562 1029 W www.nurihs.sa.edu.au FROM THE PRINCIPAL SCHOOL MUSICAL Preparation for this year’s musical, Hairspray, is in full swing. Staff and students are committing many hours of school and after hours’ time to ensure all is ready for the performances beginning on Thursday June 25. Tickets are selling fast but some remain for the matinee shows on Thursday and Friday and the evening...»

«AIR INDIA LIMITED CONTENTS Page No.1. Board of Directors 1 2. Management 2 3. Chairman’s Message 3 4. Directors’ Report 8 5. Management Discussion & Analysis Report 13 6. Annexure to Directors’ Report 35 7. Comments of the Comptroller & Auditor General of India 51 8. Statutory Auditors’ Report 55 9. Balance Sheet as at 31 March 2013 87 10. Statement of Profit & Loss Account for the year ended 31 March 2013 88 11. Cash Flow Statement 89 12. Notes forming part of the Financial...»

«DNS Tunneling for Network Penetration Daan Raman1, Bjorn De Sutter1, Bart Coppens1, Stijn Volckaert1, Koen De Bosschere1, Pieter Danhieux2, and Erik Van Buggenhout2 Computer Systems Lab, Ghent University, Belgium bjorn.desutter@elis.ugent.be Ernst & Young, ITRA FSO, Belgium Abstract. Most networks are connected to the Internet through firewalls to block attacks from the outside and to limit communication initiated from the inside. Because of the limited, supposedly safe functionality of...»

«© 2010, Global Media Journal Canadian Edition Volume 3, Issue 2, pp. 49-66 ISSN: 1918-5901 (English) ISSN: 1918-591X (Français) Propaganda and Surveillance in George Orwell’s Nineteen Eighty-Four: Two Sides of the Same Coin Michael Yeo Laurentian University, Canada Abstract: Propaganda and surveillance are pervasive in contemporary society. Extensive literatures have developed around each. George Orwell’s Nineteen Eighty-Four is an important point of reference in both literatures....»

«COMMODITY FUTURES TRADING COMMISSION Protecting commodity Futures, oPtion and swaPs markets President’s Budget F Y i s c a l e a r Prepared for the Committee on Appropriations, February 2015 U.S. Commodity Futures Trading Commission Three Lafayette Centre, 1155 21st Street, NW, Washington, DC 20581 www.cftc.gov Timothy G. Massad (202) 418-5050 Chairman (202) 418-5533 Facsimile tmassad@cftc.gov Chairman’s Transmittal Letter February 2, 2015 The Honorable Thad Cochran The Honorable Hal Rogers...»

«United Nations Development Program (UNDP) MICRO CREDIT AND WOMEN’S EMPOWERMENT: A CASE STUDY OF SML (SHARE Microfinance Ltd.,) DRAFT Anuradha Rajivan December 2001 Table of Contents Section Page List of Abbreviations 03 List of Tables 04 I. Genesis and Background 05 II. Objective 07 III. Methodology and Coverage 07 IV. Perspective and Approach of SML 10 V. Design and Management of the m-Credit Program 19 VI. Changes in the Lives of Individual Members 29 VII. Changes in the Position and Status...»





 
<<  HOME   |    CONTACTS
2017 www.sa.i-pdf.info - Abstracts, books, theses

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.