General - Permits are valid for 10 days. Travel is permitted from one-half hour before sunrise to one-half hour after sunset Monday through Sunday.

Travel embargos for Lincoln and Omaha as follows:

Lincoln - state highways only inside city limits but does not include I-80. Restricted from weekdays 7am to 9am and 4pm to 6pm, Saturday and Sunday after 12:00pm.

NE-2 08/14 SC&RA Oversize/Overweight Permit Manual Omaha - restricted from travel inside city limits on state highways and interstates weekdays 7am to 9am and 4pm to 6pm, Saturday and Sunday after 12:00pm.

Insurance — No filing is required through Permit Office. However, operators must have proof of insurance on file with the state Public Service Commission. Coverage must equal federal DOT standards ($750,000 – $5,000,000, depending on commodity and hazardous nature).

Weekend/Night Travel – Travel seven days a week, one half hour before sunrise until one half hour after sunset.

Divisible load permits are not available.

Vehicles must have a trip permit if the vehicle is not prorated in Nebraska. In addition, all vehicles must have a fuel trip permit.

Holiday – Observed Holidays – 2014 January 1, 2014 – New Year’s Office closed. Travel restricted from 12:00 p.m., December 31, 2014 until sunrise January 2, 2015.

January 20, 2014 – Martin Luther King, Jr. Day Office closed. Travel permitted.

February 17, 2014 – President’s Day Office closed. Travel permitted.

April 25, 2014 – Arbor Day Office closed. Travel permitted.

May 26, 2014 – Memorial Day Office closed. Travel restricted from sunset, May 23, 2014 until sunrise, May 27, 2014.

July 4, 2014 – Independence Day Office closed. Travel restricted from sunset, July 3, 2014 until sunrise, July 5, 2014.

September 1, 2014 – Labor Day Office closed. Travel restricted from sunset, August 29, 2014 until sunrise, September 2, 2014.

October 13, 2014 – Columbus Day Office closed. Travel permitted.

November 11, 2014 – Veteran’s Day Office closed. Travel permitted.

November 27 and 28, 2014 – Thanksgiving Office closed. Travel restricted from 12:00 p.m., November 26, 2014 until sunrise, November 29, 2014.

December 25, 2014 – Christmas Office closed. Travel restricted from sunset, December 23, 2014 until sunrise, December 26, 2014.

January 1, 2015 – New Year’s Office closed. Travel restricted from 12:00 p.m., December 31, 2014 until sunrise, January 2, 2015.

Permits for Overweight Only, are valid 24 hours a day, seven days a week. This complies with State of Nebraska, Department of Roads, Rules and Regulations pertaining to overdimensional and overweight permits.

Inclement Weather – Nebraska does not post spring restrictions and does not specifically address OS/OW restrictions for poor weather conditions; however it does note that permit extensions a made for weather conditions.

Permit Information Required — Tractor and trailer information; overall dimensions; gross weight; axle weights; bridge interior and exterior; origin and destination, routes to be traveled; effective dates.

NE-3 08/14 SC&RA Oversize/Overweight Permit Manual

PERMIT TYPES

Single Trip — For operation of vehicles with indivisible loads, for vehicles on which the load to be carried exceeds the dimensions of the vehicle, for the movement of a load with a width between 8'6" and 16', or for the movement of a vehicle which exceeds legal axle spacing or weight.

Extra Long Permit – For certain trailers and they must be empty.

Continuous Operation — For operations involving specialized equipment (e.g. oil well servicing equipment, truck cranes), the use of which is confined to a limited area, and is specific to that machine or piece of equipment. This permit is not available for movements on the Interstate or Defense Highway System, or for vehicles which exceed 14' in width, 15'6" in height, or 65' in length. Permit is issued for no more than six months.

72-hour Permit – can be obtained by accessing http://statepatrol.nebraska.gov/ScaleLocations.aspx#permit FEES Single Trip — $15 Overdimensional; $20 Overweight; $25 Overweight/Overdimensional Extra Long Permit - $250 Continuous Operation — $25 per quarter (highway construction projects; Nebraska-based carriers only).

One fee covers multiple excessive dimensions.

ESCORTS AND SIGNS

Labeling — The department shall require OVERSIZE LOAD signs and flags as follows:

On loads more than ten feet in width, signs stating OVERSIZE LOAD must be displayed to the front of the hauling vehicle and the rear of the load. The signage must comply with requirements in Section 001.26.

On loads more than twelve feet in width, red flags, not less than 18 inches square, must be displayed on all four corners of the vehicle or vehicles.

Escort vehicles/light bar requirements for overdimensional vehicles and loads:

Escort vehicles conforming to the requirements of Section 001.10 may be required for the movement of

overdimensional vehicles or loads when such vehicles or loads exceed:

8'6" in width; 90' in length; 14'6" in height Escort vehicles conforming to the requirements of Section 001.10 shall be required for the movement of





overdimensional vehicles or loads when such vehicles or loads exceed:

12' in width; 100' in length

Position of escort vehicles:

All undivided highways - to the front of the overdimensional vehicle or load.

Divided 4-lane highways - to the rear of the overdimensional vehicle or load.

Escort vehicle must travel no more than 300' from the overdimensional vehicle or load.

Light Bar:

A light bar may be allowed in lieu of an escort vehicle on divided highways when expressly stated on the

permit. The light bar attachment must comply with the following:

Must have a left and right rotating amber, yellow or flashing light of sufficient size to be seen at a distance of not less than 800'.

–  –  –

Pole Cars:

On loads which exceed 14'6" in height, a pole car may be required to the front of the overdimensional vehicle or load.

On loads which exceed 16' in height, a pole car shall be required to the front of the overdimensional vehicle or load.

On any overdimensional vehicle or load a route survey may be required.

A single escort or a flashing amber light is required for Interstate travel of vehicles with loads of over 12' in width.

Certification:

Pilot Car Escort Certification is not currently required; flagging requires certification.

FINES Overdimension Only: Minimum $25 per dimension per violation No Fuel Permit: $15

–  –  –

Operators may be fined for either over axle or over gross, whichever is the greater. Additionally, operators may be fined separately if two axle groups are over. Court costs of $21 are allowed to each fine.

Vehicle loads may be shifted to avoid axle violation if the vehicle is over on only one axle by less than 5%, provided the gross load and other axles are legal.

Operators may be fined based on legal weight. Those traveling off routes specified by permit or those not properly licensed may be deemed to have given false information to the permit office. In such cases, the state will not issue a new permit.

RESTRICTED TRAVEL

City of Omaha — also the city of Lincoln — travel restricted between the hours of 7:00–9:00 a.m. and between 4:00–6:00 p.m.

The following state highways may not be used if the vehicle exceeds 8' in width:

Highway 30 — from the east junction with Highway 75 in Blair east to Iowa.

NE-5 08/14 SC&RA Oversize/Overweight Permit Manual Highway 34 — from Plattsmouth east to Iowa.

Highway 159 — from Missouri River bridge east to Rulo.

Spring Weight – Nebraska does not post spring restrictions as such, but does have certain highways restricted to no overweight permits issued during a certain period of time when the frost is coming out of the ground.

Holiday Travel – Travel is prohibited on the following holidays: New Year’s Day, Labor Day, Memorial Day, Thanksgiving Day, Independence Day, and Christmas Day.

PORTS OF ENTRY

Port Of Entry-Omaha

–  –  –

PERMIT ORDERING

Nebraska does offer an Automated Truck Permit System accessible through the NE Department of Roads website.

Overweight (Conditional Safety Permit) - this allows a carrier to run on the interstate system over 80,000 lbs. -- divisible loads.

Call Nebraska DMV

Motor Carrier Services Division:

402-471-4435 or 888-622-1222 Hours: M-F 8:00 a.m. - 5:00 p.m.

Note: Permits may also be obtained at the Nebraska Department of Roads 402-471-0034.

• Over-dimensional and overweight permits for non-divisible loads.

Call Nebraska Department of Roads:

402-471-0034 For very heavy loads or unusual situations call: 402-479-4536 Hours: M-F 8:00 a.m. - 5:00 p.m.

SPECIAL NOTES

Recent Changes – None noted.

The Specialized Carriers & Rigging Association is pleased to publish this Oversize/ Overweight Permit Manual.

Each state analysis includes information in a standardized format: contact, legal limits, special permit limits, general restrictions, types of permits available, fees, escort needs, fines, and restricted travel areas. Telephone numbers, locations, and hours of operation are listed for ports of entry and permit branches. However, readers are always advised to check with the state offices on current laws and procedures. This project could not have been completed without the advice and consultation of many state officials. We thank all of those who provided permit manuals, maps, laws, regulations, and various other forms of documentation.

Legal Notice This SC&RA Oversize/Overweight Permit Manual is intended only to provide concise, easily read information, useful in planning movements of overdimensional and overweight loads. This Permit Manual is not intended to be an accurate summary of all the applicable laws and regulations. Users of the Permit Manual should confirm the information contained herein before dispatching vehicles and loads. The SC&RA cautions Permit Manual users that state laws and regulations are subject to change without notice, and that some time elapses between the effective date of such changes and the amendment of the Permit Manual to reflect those changes. The SC&RA assumes no responsibility for accident, injury, loss or claim, penalties or any other damage resulting from reliance on the contents of this Permit Manual.

–  –  –

OverDimensionalPermitsOffice@dot.state.nv.us (Inquiries only; no permits) 8 axles - 106,000 70’ axle spacings

PERMIT RESTRICTIONS

General - Permitted movement possible 24 hours a day if not exceeding the following dimensions: 15’ height, 14’ width, 110' length, 15' overhang, all legal and pre-approved weights. For larger dimensions, daytime travel is usually required (one-half hour before sunrise to one-half hour after sunset).

Insurance — Not required to be on file, except for vehicles moving buildings over 10' wide and all mobile homes (towing vehicle only), but vehicle operators must carry insurance coverage of at least $100,000/ $300,000/$50,000. Must carry minimum insurance of $750,000/500,000/10,000 for all ICC carriers.

Weekend/Night Travel – 24/7 weekends for 14’ wide, 110’ long, 15’ high and up to 14’ wide can secure a permit for daylight hours for ½ hour before sunrise and ½ hour after sunset.

NV-2 02/15 SC&RA Oversize/Overweight Permit Manual Holiday Restrictions for ODVs January 1 (New Year’s Day) Last Monday in May (Memorial Day) July 4 (Independence Day) First Monday in September (Labor Day) Fourth Thursday in November (Thanksgiving Day) December 25 (Christmas Day) Note: The holiday hour restrictions as described in the charts are in effect only during hours of high traffic volume associated with these specific holidays. The actual restricted timeframes may or may not be on the observed holiday. The chart below describes when the holiday hours, weekend hours, and hours of darkness restrictions are in effect when the observed holiday falls on different days of the week. Other common state and federal holidays are intentionally not included in this list and therefore holiday hour restrictions do not apply to them, though the normal restrictions for weekend hours and hours of darkness do apply. These restrictions correspond to WASHTO guidelines.

–  –  –

Note #2: Weekend Hours are from one-half hour after sunset on a Friday until one-half hour before sunrise on the immediately following Monday.

Note #4: Hours of Darkness are one-half hour after sunset until one-half hour before sunrise.

–  –  –

NRS 484.6432 requires operators of all vehicles of more than 10,000 pounds (GVW) to install chains when chains or snow tire requirements are in effect.

Vehicles over 10,000 pounds (GVW) are permitted in chain control areas when equipped with chains or Automatic Traction Devices (MTD) on drive axles. Trailer axles must be chained as indicated.

Studded snow tires are permitted between October 1 and April 30. However, retractable studded snow tires (NRS 484.6425) may be used at any time but only with the studs retracted between May 1 – September 30.

Snow tires have special tread to enhance traction and bear a permanent sidewall label consisting of the words “mud and snow” or an abbreviation using a combination of the letters “M” and “S”. Minimum tread depth for mud and snow tires is 3/16”. Trucks with cable-type chains are legal in Nevada. However, these trucks may be restricted at times due to local conditions.

The Nevada Department of Transportation and the Nevada Highway Patrol reserve the right to prohibit any vehicle from entering a chain control area when it is determined the vehicle will experience difficulty in safely traveling the area.

NOTES

• All vehicles, including four wheel drive vehicles, that are towing trailers must have chains on one drive axle.

• Trailers with brakes must have chains on the braking axle.

• Front wheel drive vehicles must have chains on front (drive) axle.

• On any semi-trailer, only one set of chains is required regardless of number of axles.

• Chains are not required on tag axle.

Chains on the inside or outside are acceptable on either axle of semi-trailers

PERMIT TYPES

Annual ODV Permits - $60 Maximum allowable dimensions shown

–  –  –

Valid for one year from date of issue.

NDOT’s goal is to provide 30-day service on annual permit requests whether first-time or renewal.

Permittee may apply via fax or at the office.

NDOT highly recommends that permittees plan at least 30 days in advance of any desired movement or lapse of any existing annual permit.

Manufactured and Mobile Homes are permitted in accordance with NAC 484.525 (2b), NRS 484.762 and NRS 484.7625.

Annual Permits Application Form Note #1: Hours of Daylight are one-half hour before sunrise until one-half hour after sunset.

Note #2: Weekend Hours are from one-half hour after sunset on a Friday until one-half hour before sunrise on the immediately following Monday.

Note #3: See Holiday Restrictions for ODVs.

NV-4 02/15 SC&RA Oversize/Overweight Permit Manual Note #4: Hours of Darkness are one-half hour after sunset until one-half hour before sunrise.

Note #5: Up to 120’ with some steerable trailers.

Note #6: Overhang is any portion of the load that extends beyond the front edge of the truck or trucktractor or beyond the rear edge of the truck or trailer. Unless otherwise specified, overhang is the sum of both the front and rear overhang.



Pages:     | 1 |   ...   | 34 | 35 || 37 | 38 |   ...   | 75 |


Similar works:

«United States Government Accountability Office GAO Testimony Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate PRIVACY For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, July 31, 2012 Federal Law Should Be Updated to Address Changing Technology Landscape Statement of Gregory C. Wilshusen, Director Information Security Issues GAO-12-961T July 31, 2012...»

«TREATIES AND OTHER INTERNATIONAL ACTS SERIES 15-624 LOAN GUARANTEE Agreement Between the UNITED STATES OF AMERICA and JORDAN Signed at Amman May 31, 2015 with Annexes NOTE BY THE DEPARTMENT OF STATE Pursuant to Public Law 89—497, approved July 8, 1966 (80 Stat. 271; 1 U.S.C. 113)— “...the Treaties and Other International Acts Series issued under the authority of the Secretary of State shall be competent evidence... of the treaties, international agreements other than treaties, and...»

«The European Journal of International Law Vol. 25 no. 3 © The Author, 2014. Published by Oxford University Press on behalf of EJIL Ltd. All rights reserved. For Permissions, please email: journals.permissions@oup.com Over-stating Palestine’s UN Membership Bid?An Ethnographic Study on the Narratives of Statehood Downloaded from http://ejil.oxfordjournals.org/ at New York University on November 5, 2014 Michelle Leanne Burgis-Kasthala* Abstract This study employs a select ethnography of...»

«IN THE SUPREME COURT OF THE STATE OF KANSAS No. 111,513 STATE OF KANSAS, Appellee, v. WILLIAM F. SCHAAL, JR., Appellant. SYLLABUS BY THE COURT 1. An appellate court reviews a district court's ruling on a presentence motion to withdraw plea for abuse of discretion. 2. Judicial discretion is abused if judicial action is (1) arbitrary, fanciful, or unreasonable, i.e., if no reasonable person would have taken the view adopted by the trial court; (2) based on an error of law, i.e., if the discretion...»

«By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By the Authority Vested By Part 5 of the United States Code § 552(a) and Part 1 of the Code of Regulations § 51 the attached document has been duly INCORPORATED BY REFERENCE and shall be considered legally binding upon all citizens and residents of the United States of America. HEED THIS NOTICE: Criminal penalties may apply for noncompliance. e AAMD: Classification in Mental Retardation Document Name: 42 CFR...»

«MINUTES OF PENZANCE TOWN COUNCIL MEETING held in The Conference Room, Zennor Building, Penwith College, Penzance on Monday 14 December 2015 at 7.00pm PRESENT Councillor D J Nebesnuick (Town Mayor) J Moreland (Deputy Mayor) Councillors D J Axford R B Cliffe M R Cotton N A Davis J H Dixon J Dunsmuir (left at 9.17pm) M Lovegrove R A Mann C M J Olivier (left at 9.13pm) N G Pengelly K L W Perry P C H Rendle R L Simmons F C Thomas-Lambourn Also present: Hester Hunt (Town Clerk), Teresa Fogarty...»

«TANAKH SOURCES OF JUDAS ISCARIOT LAWRENCE BRISKIN INTRODUCTION [Note: This Introduction is a revised and shortened version of the Introduction to the first of my articles in this series, Foretold, Fulfilled, Copied in JBQ XXXI (AprilJune 2003). For scholarly citations to the present introduction, please refer to that article. SMALL CAPS are used where emphasis has been added. – LB] For at least 1800 years Christianity and Judaism have been two separate religions. At its beginning, however,...»

«Thursday, April 17 2014 WRM# 14-15 The WRMarketplace is created exclusively for AALU Members by the AALU staff and Greenberg Traurig, one of the nation’s leading tax and wealth management law firms. The WRMarketplace provides deep insight into trends and events impacting the use of life insurance products, including key take-aways, for AALU members, clients and advisors. TOPIC: Knowing What You’re Doing: Troubleshooting Common Oversights in SplitDollar Plans. MARKET TREND: While...»

«NOT DESIGNATED FOR PUBLICATION No. 112,895 IN THE COURT OF APPEALS OF THE STATE OF KANSAS STATE OF KANSAS, Appellee, v. JIMMY L.WILSON, Appellant. MEMORANDUM OPINION Appeal from Sedgwick District Court; DAVID J. KAUFMAN, judge. Opinion filed July 1, 2016. Affirmed. Michael P. Whalen and Krystle M.S. Dalke, of Law Office of Michael P. Whalen, of Wichita, for appellant. Lesley A. Isherwood, assistant district attorney, Marc Bennett, district attorney, and Derek Schmidt, attorney general, for...»

«PECTUS PROS May 2016 IN EUROPE HAN 350 CLUBS MORE T UIPMENT TOP QUALIT Y EQ AL CL ASSES LIVE AND VIRTU OPERATION OLOGY DRIVEN TECHN E CLUBS CLEAN AND SAF Basic-Fit N.V. (a public company with limited liability (naamloze vennootschap) incorporated under the laws of the Netherlands, with its corporate seat in Hoofddorp, the Netherlands) Offering of up to 30,666,667 ordinary shares in the capital of Basic-Fit N.V. (the ‘‘Company’’) with a nominal value of A0.06 each (the ‘‘Ordinary...»

«Planning textbook development for primary education in Africa Planning textbook development for primary education in Africa Report of an H E P seminar Maputo, 19 22 November 1991 Etienne B runs wie Habib Hajjar International Institute for Educational Planning (established by UNESCO) Swedish International Development Authority The views and opinions expressed in this volume are those of the authors and do not necessarily represent the views of U N E S C O or of S I D A. T h e designations...»

«YAO’S MILLIONAIRES’ PROBLEM AND DECOY-BASED PUBLIC KEY ENCRYPTION BY CLASSICAL PHYSICS DIMA GRIGORIEV AND VLADIMIR SHPILRAIN Abstract. We use various laws of classical physics to offer several solutions of Yao’s millionaires’ problem without using any one-way functions. We also describe several informationally secure public key encryption protocols, i.e., protocols secure against passive computationally unbounded adversary. This introduces a new paradigm of decoy-based cryptography, as...»





 
<<  HOME   |    CONTACTS
2017 www.sa.i-pdf.info - Abstracts, books, theses

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.